Extracts from the ongoing Application for the amendment in the Environmental Clearance.
Justification/ Reason: The project is granted EC vide order F. No. J-11 011/19/2017/IA II (I) dt d. 31/08/2018 for 1 no. of phosgene plant & 6 nos. of multi product plant. The existing facility is now old and some plant/ infrastructures have eroded/ corroded and some modernization is proposed, so 2 nos. of multiproduct plants along with utility, storage and other associated facilities are proposed to be shifted in the additional land bearing survey no. 79B/P1(Par t) having 17532 m2 area. We had availed EC under B2 category for proposed project of API vide or der SEIAA/GUJ/EC/5( f)/1581/2021 dtd. 18/10/ 2021 on adjoining land bearing Survey Nos. 79/B P1 of Village Panelav. We have now dropped/ cancelled the proposed API project. We are applying for an EC amendment of F. No. J11011/19/2017/IA II (I) dtd. 31/08/2018, to add 17532 m2 area of land bearing Survey Nos. 79/B P1 of Village Panelav for relocating our old, eroded and corroded structure & plant and utilities from the existing premises to proposed premises.
3.9.4. Deliberations by the EAC in current meetings 3. Deliberations by the EAC (i) The Committee noted that PP is going to enhance the capacity of utility boilers. PP shall carry AAQ modeling for the same. Accordingly, PP shall update the existing EIA report and submit an addendum to the EIA report. (ii) Furnace oil shall not be used as fuel. (iii) PP shall submit CCR issued by IRO. Accordingly, the proposal was deferred for want of above additional information. Above all additional information shall be submitted online to the PARIVESH portal for further consideration by EAC.
Source: https://parivesh.nic.in//utildoc/51324847_1709560499363.pdf | Page 91 Onwards
Subscribe To Our Free Newsletter |