Great details and I completely concur!
I too have reservations about their capabilities and promises.
I checked the KMPs, effectively there is only one mechanical engineer, others from sales, finance, arts, and a CNC operator as a head of engineering and operations (no offense).
I have a PhD in aerospace engineering and have spent my time in turbomachine design and research. I can say with experience that building/even assembling a complex gas turbine engine takes a lot of experience, expertise, able people, etc even to make the best of the components.
I fail to see the evidence (pictures, videos, build plans, etc.) required for assembling engines in the public domain.
Regarding the finances, apart from nosebleed valuations, as others pointed out, there are big red flags in cash flows, inventory days (1055 days) and high WC.
Disc.: not invested.
Subscribe To Our Free Newsletter |